30 Days left!

Let’s start the countdown for the moving of our historical headquarter, actually based in Cologno M.se (Milan) to the new building located in Pioltello (Milan).  

The new headquarter has been created beacuse of the need of join the three warehouses we own into a unique one, so that we can manage in a better way the logistics connected to the Milan pole, and we can create a bigger and more modern offices.

The adventure begun one year ago, by purchasing the Pioltello field, in which we designed a building that exactely fit to our stock needs.

The new building, realized in “A” energetic class and equipped with photovoltaic system, has been built with modern warehouses principles and has been arranged with last generation automation systems.

The offices, completely realized with our products, will be equipped with lounge areas, a terrace, a dining hall, break areas with swings, highly technological meeting rooms and a gym.